• E0e9f98f4e74f1def6b086569c24d677?s=80&d=mm

    Changes from Fakejade

    Fakejade - about 6 years ago (Apr 02, 2014, 11:51 PM)
    removed 'a new chapter'
  • Changes have been accepted Merged
      Looks like something's not quite right here.. We've been notified of the issue, and will get back to you soon.
      Overview
      # A New Chapter

      Enter text in [Markdown](http://daringfireball.net/projects/markdown/). Use the toolbar above, or click the **?** button for formatting help.
      ### Event Agenda

      [ ] Prep for Event
      [ ] Tours of TechShop (15 min)
      [ ] Team Assignment and Intro (15 min)
      [ ] Build Number One (60 min)
      [ ] Award “Straightline” prize for “most needs additional creativity” (5 min)
      [ ] Build Number Two (25 min)
      [ ] Get Set (5 min)
      [ ] Team Interviews + Team Names (20 min)
      [ ] Final Run (10 min)
      [ ] Award the Rube price + Interview (5 min)
      [ ] Gratitude and Celebration

      Pre Event Checklists

      Bathroom
      Buffet table
      -Floor
      Music & Mics
      Stack chairs
      Team Numbers
      Tape team areas on ground
      One trigger per team + one to start
      Bin wall
      Make it appear like there is an abundance of objects to choose from.
      Tool table(s) and supplies
      Food & Beverages
      Don’t set out until 40 minutes into event

      Post Event
      Organize
      Bin wall pieces
      Tools
      Triggers
      Clean
      Dishes
      Wipe down counters/kitchen
      Bathroom wipe down & trash
      Sweep & Vacuum
      Trash
      Default room setup
      Room_Setup
      ###Room Prep

      1) Room Setup at Techshop
      - Address the wreckage caused by previous occupants.
      - Bathroom (mirror, sink, toilet, floor, trash)
      - Trash/recycling
      - Bar counter top
      - stow chairs/tables
      - Set up the bin wall table and bring out the event materials.
      - Set up the tool table and bring out the tools/tape.
      - Arrange event materials/tools in an attractive and inviting way.
      - Choose triggers and place them at start/finish and in between team areas
      - Apply blue tape on the floor randomly.
      - Set the bathroom on fire.

      ![obviously drinking in the bath is prohibited](http://image.shutterstock.com/display_pic_with_logo/62138/62138,1328410576,1/stock-photo-bathroom-disaster-fire-in-the-bathroom-caused-by-smoking-and-drinking-94354333.jpg)

      PA & Electronics
      Music & Mics


      2) Room Setup Offsite
      - Locate specific event space and decide on best orrientation (including chain reaction device flow direction, tool and material table locations, preserving walking space).
      - Set up the tool and materials tables.
      - Unload tools and materials from the van/truck onto the tables.
      - Arrange tools and materials in an attractive and inviting way.
      - Unload triggers and place them in between team areas.
      - Apply blue tape to the floor randomly.
      - Locate bathroom.
      - Set the bathroom on fire.